Ethan Elkind

Location, location: Solar PV and the San Joaquin Valley

Ethan Elkind co-writes for Capitol Weekly, May 16, 2016

Out of the 9.5 million acres in the stakeholder study area, the groups identified 470,000 acres of ideal, non-controversial land for solar PV development, or roughly 5 percent of the Valley study area.  At a generic calculation of 1 megawatt of solar PV production from 5 acres of panels, that means the lands identified could provide 94,000 megawatts of renewable power.

Sepulveda tunnel, faster subway work possible with Metro’s $120 billion measure

Ethan Elkind interviewed by KPCC-FM, March 11, 2016

Agencies around the country have turned more and more to sales tax measures to fund projects as federal and state sources for transit construction have dried up. “It’s definitely not the best way to run the rodeo,” said Elkind. “The problem is there aren’t a lot of great sources of funding out there, so this self-help approach is really the best.”

City Visions: Making the case for a second transbay rail crossing

Ethan Elkind hosts KALW-FM, March 7, 2016

“With the Bay Area’s population growing at a rapid pace and increasing numbers of residents choosing public transportation, how long before the current transportation infrastructure reaches a breaking point? … Is the time ripe for such a significant undertaking?